Wheatstone Gas Project
Please provide very short intro voluptae odiaepel min exerum que lam elenda venecusdant. Sed qui sequam quae pero mi, sed ut qui rerspe mil is et laut mollore.
Introduction
Permacast expertly delivered the Wheatstone Gas Project, managing a highly complex and ambitious scope that required precision engineering, rigorous quality control, and innovative precast solutions. The project showcased our ability to produce a diverse range of specialised precast components, including culvert trench units, perlite-lined trench units, perlite wall panels, fire-rated wall panels, and robust firewall columns. Our approach demonstrated exceptional attention to detail, adaptability, and reliability, ensuring the highest standards were met across all aspects of manufacturing and delivery.
Client
tbc
Location
tbc
Duration
tbc
Cost
{acf_cost}
Project Specifications
- 975 Culvert Trench Units (average weight 20 tonnes)
- 113 Perlite Lined Trench Units
- 760 Perlite Wall Panels (average weight 170 kilograms)
- 703 Fire Wall Panels (average weight 4 tonnes)
- 254 Firewall Columns (average weight 14 tonnes)
Project Details
- Each precast culvert unit was uniquely designed to precisely match the finished floor level (FFL) gradients and falls, ensuring perfect site integration.
- Advanced 3D modelling was employed to guarantee constructability and manufacturing accuracy for every unit.
- Originally intended as an in-situ solution, the project was adapted for precast components without compromising design integrity.
- Products were manufactured to exacting standards, with stringent quality controls and comprehensive reporting throughout the process.
- Detailed joint designs ensured watertight connections, eliminating leaks at in-situ interfaces.
- Capacity to store up to 700 culverts enabled efficient just-in-time delivery, optimizing site logistics.
- Utilised high-specification S50 low-heat concrete to achieve overnight strengths of 20 megapascals.
- Maintained a consistent production rate with daily casting of six culverts, meeting tight project timelines.